Commissioning and HandoverFAT

Factory Acceptance Test

A Factory Acceptance Test verifies equipment, panels, software, or systems at the supplier's facility before shipment.

What this term means in maintenance

A Factory Acceptance Test verifies equipment, panels, software, or systems at the supplier's facility before shipment.

What FAT may verify

Testing may include:

  • Design requirements
  • Dimensions
  • Materials
  • Controls
  • Alarms
  • Interlocks
  • Software
  • Performance
  • Documentation
  • Spare parts

Practical example

A control panel is powered and tested at the manufacturer before delivery to the plant.

FAT documents

The test should use an approved procedure, acceptance criteria, results, deviations, punch list, and signatures.

Limitations

FAT cannot prove every site condition, installation interface, or actual process load.

Common mistake

Shipping equipment with unresolved critical FAT failures transfers known problems to the site.

How this term differs

Factory Acceptance Test is supplier-site testing before equipment shipment. It is related to Site Acceptance Test, Operational Qualification, and Performance Qualification, but these terms describe different records, measures, roles, strategies, or decisions and should not be used interchangeably.

Related maintenance terms

Keep exploring connected CMMS, reliability, and maintenance planning terms.

Factory Acceptance Test FAQs

What does FAT stand for?

FAT stands for Factory Acceptance Test.

Where is FAT performed?

At the supplier or manufacturer's facility before shipment.

What does FAT not prove?

Actual site utilities, installation interfaces, and full operating conditions.

Turn Maintenance Definitions into a Proper Action

MaintBoard helps Plant Heads and Maintenance Heads improve equipment reliability, reduce repair delays, and gain better visibility into maintenance operations.